Documentation scienceplus.abes.fr version Bêta

À propos de : Bicriteria scheduling for due date assignment with total weighted tardiness        

AttributsValeurs
type
Is Part Of
Subject
Title
  • Bicriteria scheduling for due date assignment with total weighted tardiness
Date
has manifestation of work
related by
Author
Abstract
  • In the due date assignment, the bicriteria scheduling models are motivated by the trade-off between the due date assignment cost and a performance criterion of the scheduling system. The bicriteria scheduling models related to the maximum tardiness and the weighted number of tardy jobs have been studied in the literature. In this paper we consider a new model with criteria of the due date assignment cost and the total weighted tardiness. The main results are polynomial-time algorithms for the linear combination version, the constraint version, and the Pareto optimization version of bicriteria scheduling.
article type
publisher identifier
  • ro160138
Date Copyrighted
Rights
  • © EDP Sciences, ROADEF, SMAI 2018
Rights Holder
  • EDP Sciences, ROADEF, SMAI
is part of this journal
is primary topic of



Alternative Linked Data Documents: ODE     Content Formats:       RDF       ODATA       Microdata